Covered Bridge Restoration and Relocation :: 3G Construction :: Holderness, NH

Covered Bridge Restoration and Relocation

Bump Covered Bridge Restoration


2008 - 2009 Bump Covered Bridge ( Queen Post )

  • Install temporary shoring in the river, remove bridge supports
  • Dewater, excavate river bed and install new concrete footers and stub wall.
  • Re build and re chink historic stone abutments
  • Apply Nochar fire retardant, re roof
  • Install heavy timber support bents
  • Owner: Town of Campton, N.H.
  • Engineer: Dubois & King, contact Mr. Durfee
  • Contact: Ann Marie Foote

back to top